A rubber-tired tram linking Mt. Fuji’s foothills with the 5th Station, now under study by Yamanashi Prefecture.

“Next-generation mobility connecting the future of Mt. Fuji with people’s lives”Yamanashi Prefecture

Illustration

Terrain, imagery and route are real data; the vehicle’s shape and colours are illustrative. Credits

How it works

How the Fuji Tram works

Announced by Yamanashi Prefecture in November 2024, the Fuji Tram is a next-generation alternative to the light rail line studied until then.

  • Rubber tires

    It rolls on rubber tires rather than steel wheels, reusing the existing Fuji Subaru Line road.

  • No rails, no wires

    No steel track to lay and no overhead power lines to string, so the mountain’s scenery stays clear.

  • Guided by lines or magnets

    A camera reads painted lines on the road, or sensors read magnetic markers set into it, keeping the vehicle on its path.

  • Hydrogen and batteries

    Fuel cells running on green hydrogen, plus batteries. No exhaust while it runs.

The vehicle

The vehicle under study

The specifications are not final, but Yamanashi Prefecture assumes a vehicle 30 m long, 2.65 m wide and 3.6 m tall, with 60 seats. Two coupled units can carry 120 people.

Length 30 mHeight 3.6 mFuel cells (hydrogen)BatteriesRubber tiresFollows painted lines or magnetic markersNo overhead wires
Illustration based on Yamanashi Prefecture’s published assumptions. The actual design has not been decided.Swipe sideways to see the whole drawing.
Length
30m
Width
2.65m
Height
3.6m
Seats
60
Two units
120people
Days a year (est.)
280days

Operating days are the estimate for the section above the 4th Station. Construction costs are expected to be far lower than for the rail plan.

Why now

Three problems Mt. Fuji faces

Yamanashi Prefecture names these three as the starting point for the Fuji Tram.

  1. Too many people

    Since the 2013 inscription, visitor numbers at the 5th Station have kept rising, beyond what it can handle.

  2. Environmental load

    The 5th Station has no power grid, water mains or sewerage. Trucks hauling fuel oil and water, plus buses and cars, strain the mountain.

  3. A sacred landscape

    Mt. Fuji was inscribed as a sacred mountain. Its scenery should live up to that.

History

How we got here

  1. 1964

    The Fuji Subaru Line toll road opens

  2. 1994–96

    Yamanashi studies a new transit system, without reaching a conclusion

  3. 2013

    Mt. Fuji is inscribed as a World Heritage site

  4. 2021

    An expert panel recommends a light rail line on the Subaru Line

  5. 2023.11

    Discussions begin in the northern foothills

  6. 2024.11.13

    A public hearing on the mountain railway plan

  7. 2024.11.18

    The Fuji Tram is announced: rubber tires instead of rails

  8. 2025.6.5

    Results of the fiscal 2024 study are published

Fuji Tram introduction video (YouTube, Japanese)

Hirabayashi’s hope

Make protecting Mt. Fuji a movement of the whole nation.

World Heritage status was never the finish line. A director of the Mt. Fuji Mountain Railway Project Study Committee since 2019, Hirabayashi supports the Fuji Tram so that the mountain’s value and cultural landscape can be handed on to future generations.

About the 3D map data

The 3D Mt. Fuji and the Fuji Subaru Line route on this site are built from the open data below. Trees, clouds and water are drawn in, guided by the satellite imagery. The Fuji Tram’s shape and colours are illustrative; the actual design has not been decided.

Elevation and lakes
Copernicus DEM (GLO-30), from the European Union and ESA’s Copernicus programme.Produced using Copernicus WorldDEM-30 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018 provided under COPERNICUS by the European Union and ESA; all rights reserved. The organisations in charge of the Copernicus programme by law or by delegation do not incur any liability for any use of the Copernicus WorldDEM-30.
Satellite imagery
Copernicus Sentinel-2 (captured in May 2024 and April 2026).Contains modified Copernicus Sentinel data 2024, 2026.
Route (Fuji Subaru Line)
OpenStreetMap data, as distributed by the Overture Maps Foundation, available under the Open Database License (ODbL).© OpenStreetMap contributors(Opens an external site), Overture Maps Foundation.

On this page

  1. Overview
  2. How it works
  3. Vehicle
  4. Why now
  5. History
  6. His hope
  7. Map data